Market-reference note: Numerical default-price examples below retain their cited 2026 reference period. They are historical class-level context, not a current account quote. Confirm the applicable business rate, components and effective dates on your bill before comparing an offer. How to establish your benchmark.
What does electricity cost a office building in Akron?
A mid-size office building (50,000 ft²) uses roughly 680,000 kWh a year. CBECS 2018 puts offices at about 13.6 kWh per square foot per year (median 10.1); the average office building uses about 234,000 kWh a year. In Akron, that power is delivered by Ohio Edison, and the generation portion can be bought from a PUCO-certified supplier.
On Ohio Edison's default price for small businesses — about 9.38¢/kWh on the GS rate (June 1, 2026 – May 31, 2027, annual average) — the generation cost alone for the sites below looks like this:
| Illustrative site | Annual use | Est. peak demand | Est. capacity tag | Capacity cost at 2026/27 price | Generation cost at 9.38¢/kWh | Value of 0.5¢/kWh |
|---|---|---|---|---|---|---|
| 10,000 ft² | 136,000 kWh | 35 kW | 29 kW | $3,523/yr (≈2.6¢/kWh) | $12,755/yr | $680/yr |
| 50,000 ft² | 680,000 kWh | 173 kW | 147 kW | $17,617/yr (≈2.6¢/kWh) | $63,774/yr | $3,400/yr |
| 150,000 ft² | 2.04 million kWh | 518 kW | 440 kW | $52,850/yr (≈2.6¢/kWh) | $191,323/yr | $10,200/yr |
How these numbers are built: annual use = 13.6 kWh/ft² (EIA CBECS 2018 Table C14, office (mean; median 10.1)). Peak demand assumes a 45% load factor; the capacity tag assumes 85% of that peak falls in the grid's summer peak hours. Capacity cost uses PJM's 2026/27 clearing price of $329.17/MW-day (about $120 per kW-year) before utility scaling factors. These are illustrations for sizing a decision — your own bills and interval data are what suppliers price.
What drives a Akron office building's bill
Ventilation is the largest office electric end use in CBECS (about 28%), then lighting (17%), computing (11%) and cooling (10%).
Median office operating hours are 45 a week: a weekday daytime profile that peaks on summer afternoons. Buildings with partial post-pandemic occupancy often still run HVAC as if they were full.
On an Ohio Edison bill those loads show up in three places: the generation charge (the only part a supplier replaces), transmission and distribution charges set by PUCO-approved tariffs, and — for most business rate schedules — a demand charge on your peak kilowatts. FirstEnergy bills show a "Price to Compare" on the generation section. For businesses on the GS rate, Ohio Edison's default generation price averaged about 9.38¢/kWh for June 2026–May 2027.
Akron specifics
Akron is FirstEnergy's home city, and most Akron businesses are Ohio Edison customers. Two neighbors are different: Cuyahoga Falls and Hudson run municipal electric systems whose customers generally cannot shop.
Ohio Edison's GS default generation price averaged about 9.38¢/kWh for June 2026–May 2027, up from about 8.87¢.
Buying electricity for one Akron office building
Single-tenant offices usually buy standard fixed products; multi-tenant landlords buy base-building (common area and central HVAC) power and may resell or allocate it to tenants under the lease.
Practical steps for a single location:
- Pull 12 months of Ohio Edison bills and note the rate schedule, peak kW and any supplier already listed.
- If the site uses 700,000 kWh a year or less and never chose a supplier, check whether it was enrolled in a community aggregation program.
- Ask for fixed prices that include capacity for 12, 24 and 36 months and compare each against the default price on your actual usage.
- Make sure every quote shows broker compensation and any pass-through charges as separate lines.
Where a Akron office building can cut costs
- Re-set HVAC schedules and ventilation rates to actual occupancy (badge data is a good source).
- Retro-commission the building automation system: fix simultaneous heating/cooling and overridden schedules.
- Upgrade to LED with occupancy and daylight controls.
- Tie server-room cooling to its own efficient unit instead of running the whole building overnight.
Ohio's utilities no longer offer general business efficiency rebates (PUCO ended or declined those programs in 2024–2025), so projects have to pay back on energy and demand savings alone.
FAQ
How much does electricity cost for a office building in Akron?
At Ohio Edison's small-business default generation price of about 9.38¢/kWh, a 50,000 ft² office building using 680,000 kWh a year would pay about $63,774 a year for generation alone, before delivery, demand charges and taxes.
Which utility serves office buildings in Akron?
Ohio Edison.
How much electricity does an office building use?
CBECS 2018 reports about 13.6 kWh per square foot per year on average, so a 50,000 ft² office would use roughly 680,000 kWh.
What is the biggest electric load in an office?
Ventilation fans (about 28% of office electricity in CBECS), followed by lighting.
Related: Office buildings in Ohio · Akron business electricity · Ohio Edison guide · Office buildings across Summit County
Decision worksheet: Akron office building operations
Renewal and operating-hour control
Use the Ohio Edison account’s signed renewal clause as the first milestone. If a national operator owns the location, do not infer customer classification solely from this site’s annual kWh. Separate the legal buyer from the local manager who receives the bill.
For a office building in this market, the useful starting evidence is occupied-hours demand separately from overnight building operation. This is a review question, not an assumption that every local facility has the same equipment or schedule. Record what your site actually does, then explain the difference between the historical bill period and the proposed contract term.
| Delivery-utility guide for Akron | Evidence needed before pricing |
|---|
The local guide is a starting map, not an address-level enrollment determination. Keep utility bills and account identifiers in the private document package, not the initial website inquiry. The Ohio bill guide explains how to identify the delivery and supply companies.
A office building review should test these operating questions
- Load separation: identify HVAC, lighting, plug loads and tenant schedules. Distinguish electricity use from gas, water and other operating costs before comparing a retail electric offer.
- Change case: document hybrid-work changes, tenant fit-outs or leased-space vacancy. Ask the supplier whether that change affects quoted volume, capacity treatment, demand assumptions or the offer’s validity.
- Comparable performance: track kWh per occupied square foot and operating hour. A raw dollar-per-month comparison mixes prices and operations; a unit measure needs the operating context beside it.
- Account responsibility: Who controls after-hours HVAC overrides? Record the responsible party and who can authorize a contract before asking someone to sign.
- Contract fit: Does the landlord or each tenant sign for its own meter? Ask for the answer in the actual agreement or written offer schedule, rather than relying on a sales summary.
Evidence table for the next decision
| Question for this office building | Bring this evidence | What a useful answer looks like |
|---|---|---|
| Has the bill risen because of price or operations? | Same-period kWh, peak kW where billed, hours and production/occupancy records | A separation of rate, volume and demand effects; no automatic savings claim |
| Will the next term resemble the last twelve months? | The planned hybrid-work changes, tenant fit-outs or leased-space vacancy | A base case and a change case, with supplier tolerances shown |
| Are supply offers priced on equal terms? | Start dates, included components, additional fees and offer expiry | One comparison matrix that identifies every excluded or adjustable item |
| Is the site free to enroll when proposed? | Current agreement, renewal notice and actual utility confirmation | A documented timeline that avoids an unintended rollover or early-exit charge |
Portfolio review across Summit County
Use a separate row for every property rather than one total for the whole business. Start with Akron, Barberton, Cuyahoga Falls, Green, Stow. A common owner can negotiate a master agreement, but meters still have their own rate classes, delivery utilities, start dates and operational constraints. Do not assume that pooling bills creates a volume discount or makes a municipal meter eligible.
For office buildings, preserve kWh per occupied square foot and operating hour at site level before rolling it into a portfolio dashboard. Otherwise a busy or continuously operating location can hide the cost of an idle one. Align contract end dates only after identifying any early-exit costs, add/delete rights and ownership-transfer provisions.
Turn this into a review request
Use the private comparison and renewal tools for a first pass. They do not submit your figures. If you want help, choose “Offer comparison” or “Renewal planner” on the Ohio inquiry form, identify Akron, and describe the question without account numbers or attachments. A supplier bid follows only if the account and decision support that step.
Primary reference points: PUCO electric-bill definitions, Ohio customer classifications and customer-choice guidance. Operating prompts above are planning guidance, not measured local savings or a claim about a specific customer.