Akron Shopping Center Electricity Costs: Ohio Edison Guide

Shopping Centers · Akron, Ohio

Updated Ohio Commercial Energy editorial teamHow we review contentBook a free 15-min bill review

Market-reference note: Numerical default-price examples below retain their cited 2026 reference period. They are historical class-level context, not a current account quote. Confirm the applicable business rate, components and effective dates on your bill before comparing an offer. How to establish your benchmark.

What does electricity cost a shopping center in Akron?

A mid-size shopping center (80,000 ft²) uses roughly 1.57 million kWh a year. CBECS 2018 puts enclosed and strip malls at about 19.6 kWh per square foot per year; strip shopping centers average about 20.6. In Akron, that power is delivered by Ohio Edison, and the generation portion can be bought from a PUCO-certified supplier.

On Ohio Edison's default price for small businesses — about 9.38¢/kWh on the GS rate (June 1, 2026 – May 31, 2027, annual average) — the generation cost alone for the sites below looks like this:

Illustrative site Annual use Est. peak demand Est. capacity tag Capacity cost at 2026/27 price Generation cost at 9.38¢/kWh Value of 0.5¢/kWh
30,000 ft² 588,000 kWh 134 kW 114 kW $13,710/yr (≈2.3¢/kWh) $55,146/yr $2,940/yr
80,000 ft² 1.57 million kWh 358 kW 304 kW $36,560/yr (≈2.3¢/kWh) $147,056/yr $7,840/yr
200,000 ft² 3.92 million kWh 895 kW 761 kW $91,400/yr (≈2.3¢/kWh) $367,641/yr $19,600/yr

How these numbers are built: annual use = 19.6 kWh/ft² (EIA CBECS 2018 Table C14, enclosed and strip malls (mean; median 20.1)). Peak demand assumes a 50% load factor; the capacity tag assumes 85% of that peak falls in the grid's summer peak hours. Capacity cost uses PJM's 2026/27 clearing price of $329.17/MW-day (about $120 per kW-year) before utility scaling factors. These are illustrations for sizing a decision — your own bills and interval data are what suppliers price.

What drives a Akron shopping center's bill

In CBECS, mall electricity goes to lighting (about 21%), ventilation (15%), refrigeration (15% — restaurants and grocery tenants), cooling (11%) and space heating (8%).

Strip centers run a median 55 hours a week and enclosed malls 73. Tenant mix drives the shape: a grocery or restaurant anchor flattens the load, while apparel-heavy centers peak on weekend afternoons.

On an Ohio Edison bill those loads show up in three places: the generation charge (the only part a supplier replaces), transmission and distribution charges set by PUCO-approved tariffs, and — for most business rate schedules — a demand charge on your peak kilowatts. FirstEnergy bills show a "Price to Compare" on the generation section. For businesses on the GS rate, Ohio Edison's default generation price averaged about 9.38¢/kWh for June 2026–May 2027.

Akron specifics

Akron is FirstEnergy's home city, and most Akron businesses are Ohio Edison customers. Two neighbors are different: Cuyahoga Falls and Hudson run municipal electric systems whose customers generally cannot shop.

Ohio Edison's GS default generation price averaged about 9.38¢/kWh for June 2026–May 2027, up from about 8.87¢.

Buying electricity for one Akron shopping center

The owner buys power for common areas, parking lighting and any master-metered tenants; tenants with their own meters buy their own supply. Owners with several centers often combine landlord meters into one contract.

Practical steps for a single location:

  1. Pull 12 months of Ohio Edison bills and note the rate schedule, peak kW and any supplier already listed.
  2. If the site uses 700,000 kWh a year or less and never chose a supplier, check whether it was enrolled in a community aggregation program.
  3. Ask for fixed prices that include capacity for 12, 24 and 36 months and compare each against the default price on your actual usage.
  4. Make sure every quote shows broker compensation and any pass-through charges as separate lines.

Where a Akron shopping center can cut costs

  • Put parking-lot and façade lighting on LED with photocell plus time-clock control.
  • Separate landlord (common-area) meters from tenant meters and audit which loads the landlord actually pays for.
  • Review common-area HVAC schedules against tenant hours.
  • Use lease language to require tenant data sharing for building-level benchmarking.

Ohio's utilities no longer offer general business efficiency rebates (PUCO ended or declined those programs in 2024–2025), so projects have to pay back on energy and demand savings alone.

FAQ

How much does electricity cost for a shopping center in Akron?

At Ohio Edison's small-business default generation price of about 9.38¢/kWh, a 80,000 ft² shopping center using 1.57 million kWh a year would pay about $147,056 a year for generation alone, before delivery, demand charges and taxes.

Which utility serves shopping centers in Akron?

Ohio Edison.

Who pays for electricity in a shopping center?

Tenants on separate meters pay their own; the landlord pays for common areas, parking lighting and master-metered spaces, usually recovered through CAM.

How much electricity does a strip mall use?

CBECS 2018 averages about 20.6 kWh per square foot per year for strip shopping centers, tenant loads included.

Related: Shopping centers & strip malls in Ohio · Akron business electricity · Ohio Edison guide · Shopping centers & strip malls across Summit County

Decision worksheet: Akron shopping center operations

Renewal and operating-hour control

Use the Ohio Edison account’s signed renewal clause as the first milestone. If a national operator owns the location, do not infer customer classification solely from this site’s annual kWh. Separate the legal buyer from the local manager who receives the bill.

For a shopping center in this market, the useful starting evidence is landlord meters separately from individually contracted tenant services. This is a review question, not an assumption that every local facility has the same equipment or schedule. Record what your site actually does, then explain the difference between the historical bill period and the proposed contract term.

Delivery-utility guide for Akron Evidence needed before pricing

The local guide is a starting map, not an address-level enrollment determination. Keep utility bills and account identifiers in the private document package, not the initial website inquiry. The Ohio bill guide explains how to identify the delivery and supply companies.

A shopping center review should test these operating questions

  • Load separation: identify common-area lighting, tenant loads and shared HVAC. Distinguish electricity use from gas, water and other operating costs before comparing a retail electric offer.
  • Change case: document tenant turnover, added refrigeration or common-area EV charging. Ask the supplier whether that change affects quoted volume, capacity treatment, demand assumptions or the offer’s validity.
  • Comparable performance: track common-area kWh and demand per leased square foot. A raw dollar-per-month comparison mixes prices and operations; a unit measure needs the operating context beside it.
  • Account responsibility: Which meters are recoverable through lease charges? Record the responsible party and who can authorize a contract before asking someone to sign.
  • Contract fit: Do add/delete clauses cover a tenant taking its meter direct? Ask for the answer in the actual agreement or written offer schedule, rather than relying on a sales summary.

Evidence table for the next decision

Question for this shopping center Bring this evidence What a useful answer looks like
Has the bill risen because of price or operations? Same-period kWh, peak kW where billed, hours and production/occupancy records A separation of rate, volume and demand effects; no automatic savings claim
Will the next term resemble the last twelve months? The planned tenant turnover, added refrigeration or common-area EV charging A base case and a change case, with supplier tolerances shown
Are supply offers priced on equal terms? Start dates, included components, additional fees and offer expiry One comparison matrix that identifies every excluded or adjustable item
Is the site free to enroll when proposed? Current agreement, renewal notice and actual utility confirmation A documented timeline that avoids an unintended rollover or early-exit charge

Portfolio review across Summit County

Use a separate row for every property rather than one total for the whole business. Start with Akron, Barberton, Cuyahoga Falls, Green, Stow. A common owner can negotiate a master agreement, but meters still have their own rate classes, delivery utilities, start dates and operational constraints. Do not assume that pooling bills creates a volume discount or makes a municipal meter eligible.

For shopping centers, preserve common-area kWh and demand per leased square foot at site level before rolling it into a portfolio dashboard. Otherwise a busy or continuously operating location can hide the cost of an idle one. Align contract end dates only after identifying any early-exit costs, add/delete rights and ownership-transfer provisions.

Turn this into a review request

Use the private comparison and renewal tools for a first pass. They do not submit your figures. If you want help, choose “Offer comparison” or “Renewal planner” on the Ohio inquiry form, identify Akron, and describe the question without account numbers or attachments. A supplier bid follows only if the account and decision support that step.

Primary reference points: PUCO electric-bill definitions, Ohio customer classifications and customer-choice guidance. Operating prompts above are planning guidance, not measured local savings or a claim about a specific customer.

Request a reviewCall