Chillicothe Business Electricity: AEP Ohio Rates & Choice

Electric utility: AEP Ohio · Ross County

Updated Ohio Commercial Energy editorial teamHow we review contentBook a free 15-min bill review

Who supplies electricity to businesses in Chillicothe?

Most businesses in Chillicothe (Ross County) are served by AEP Ohio, a subsidiary of American Electric Power (AEP). Because Chillicothe is in AEP Ohio's territory, a business can buy the generation part of its electricity from any supplier certified by the Public Utilities Commission of Ohio (PUCO), while AEP Ohio keeps delivering the power, reading the meter and restoring outages.

AEP Ohio begins operating under the name Ohio Power Company on October 1, 2026 (website OhioPowerCo.com). The utility says rates, service, account numbers and supplier choice don't change.

Chillicothe at a glance
Population (2020 Census) 22,059
County Ross County (county seat: Chillicothe)
Electric utility (delivery) AEP Ohio
Can businesses choose a supplier? Yes, for accounts on AEP Ohio
Default generation price, small business Varies by rate schedule — shown on your bill
Community aggregation SOPEC (member community)
Grid operator / capacity zone PJM Interconnection, AEP zone
Capacity price, June 2026–May 2027 $329.17/MW-day (up from $28.92 in 2024/25)

Chillicothe's business base

Chillicothe had 22,059 residents in the 2020 Census and the county seat. Ross County seat and regional economic hub. Large employers and institutions include Adena Regional Medical Center, Chillicothe VA Medical Center, Ross Correctional Institution, and Kenworth Truck Co (PACCAR). Hospitals, campuses and plants tend to buy through structured bids with interval data, while offices, shops and restaurants usually fall under Ohio's 700,000 kWh-a-year “mercantile” line and buy standard small-business products.

The price to beat on AEP Ohio

AEP Ohio does not publish one small-business price to compare — it depends on your rate schedule (GS-1 / GS-2) and appears on your bill. For reference, PUCO's residential price to compare for AEP Ohio was 10.97¢/kWh for July 1 – Sept 30, 2026; business figures differ.

That default — PUCO calls it the price to compare — is what a Chillicothe business pays for generation if it never signs with a supplier. A supplier offer only helps if its all-in generation price, including capacity and any broker fee, beats it on your usage. Statewide, EIA data show the average all-in commercial price rose to about 13.78¢/kWh in the first half of 2026 from 11.07¢ a year earlier, mostly because PJM capacity prices jumped from $28.92 to $329.17 per MW-day.

The delivery utility remains responsible for the wires. Tariff charges can change over time; confirm which transmission and other components are included in a supply offer. AEP Ohio's latest rate-case status: PUCO approved a settlement on April 1, 2026: base distribution revenue +$11 million (AEP asked for $97 million), offset by a roughly $105 million tax refund over 18 months, for a net annual revenue decrease of about $58.7 million. AEP Ohio is also moving to a three-part bill (distribution, transmission, generation) starting in fall 2026.

Is Chillicothe in a community aggregation program?

Chillicothe is listed as a member community of SOPEC, a council of governments whose electric aggregation covers eligible residential and small commercial accounts, with AEP Energy as the generation supplier. Community-specific rates are posted on SOPEC's site.

Opt-out aggregation automatically enrolls small accounts (700,000 kWh a year or less) that haven't chosen a supplier; accounts already under contract are excluded and larger “mercantile” accounts join only if they opt in. If your Chillicothe bill names an aggregation supplier you never picked, that is why. You can leave for a commercial offer priced on your own usage — compare the aggregation price with it first. How aggregation interacts with a business contract is covered in governmental aggregation for Ohio businesses.

Chillicothe's neighbors and multi-site buying

If you run locations in more than one town, price them by utility. The nearest cities covered on this site:

City Distance Electric utility
Circleville 18 miles AEP Ohio
Washington Court House 28 miles AES Ohio
Lancaster 33 miles AEP Ohio
Grove City 38 miles AEP Ohio
Portsmouth 40 miles AEP Ohio

Nearby sites fall under AES Ohio as well as AEP Ohio, so expect a separate price per utility even from one supplier — and leave municipal-utility sites out of the bid.

Switching suppliers in Chillicothe

Send 12 months of AEP Ohio bills (interval data for larger sites), the account numbers and the legal name on the account, plus any current supplier's end date. Ask every bidder to show capacity and broker compensation as separate lines (how broker fees work), and compare each offer with AEP Ohio's default price on the same usage. AEP Ohio requires a supplier to submit your enrollment at least 12 days before your next scheduled meter read; the switch then takes effect on that read. Step-by-step detail is in our AEP Ohio guide.

FAQ: business electricity in Chillicothe

What electric company serves businesses in Chillicothe, Ohio?

AEP Ohio delivers electricity to most businesses in Chillicothe. AEP Ohio begins operating under the name Ohio Power Company on October 1, 2026.

Can a business in Chillicothe choose its electricity supplier?

Yes. Businesses on AEP Ohio can buy generation from any PUCO-certified supplier; AEP Ohio keeps delivering power and restoring outages.

What is the price to compare for Chillicothe businesses?

It depends on your AEP Ohio rate schedule and is printed on your bill; AEP Ohio publishes business figures through a bill-specific tool rather than one number.

Is there electric aggregation for businesses in Chillicothe?

Chillicothe is listed as a member community of SOPEC, a council of governments whose electric aggregation covers eligible residential and small commercial accounts, with AEP Energy as the generation supplier. Small accounts that never chose a supplier may be enrolled automatically and can opt out.

How long does it take to switch suppliers in Chillicothe?

AEP Ohio requires a supplier to submit your enrollment at least 12 days before your next scheduled meter read; the switch then takes effect on that read. Small commercial customers then have 7 days from the utility's confirmation letter to cancel.

Decision worksheet: a business site in Chillicothe

Resolve the account before the price

For an account whose bill names AEP Ohio, check its actual business rate class and current supply arrangement. A nearby municipal or cooperative account can have different options. Start with the delivery company, legal customer and service address; a city name cannot establish those details.

The useful county-level comparison is Ross County. Other city guides from that county include the Ross County guide. Those links describe related service-area questions, not a promise that every address shares one provider.

Three different decisions can sit behind one bill question

Your Chillicothe situation First document to check Appropriate next step
Existing supplier agreement is ending Signed renewal/termination clause and last complete bill Use the renewal planner, then confirm the actual contractual notice dates
Building operation or ownership is changing Lease/ownership responsibility and the expected load change Ask about assignment, add/delete rights and volume tolerances before quoting
Bill is higher but operations look unchanged Comparable kWh, demand and charge components for the same period Separate price, usage and demand effects rather than assuming a supply switch fixes everything

For this local review, the AEP Ohio guide explains the supply-versus-delivery distinction. Keep tax, banking and account identifiers out of the first inquiry. A discussion can establish whether any private document exchange is needed.

Reference: PUCO choice and bill definitions. This decision worksheet adds account-level checks; it is not a new address-level territory survey.