The short answer

Portfolio energy analytics means turning dozens of utility bills into a handful of numbers that tell you which sites cost too much and why. Five metrics do most of the work: all-in cost per kWh, kWh per square foot (or per unit), load factor, capacity tag per site, and month-over-month exceptions. Track them in one table and the outliers become obvious.

For getting interval data out of Ohio utilities, see Ohio energy data sources.

The five portfolio metrics

Metric Formula What an outlier usually means
All-in ¢/kWh Total bill $ ÷ kWh Wrong rate schedule, high demand, or a missed contract (site on default or variable price)
Energy intensity kWh ÷ ft² (or ÷ units produced) Equipment problems, schedules, or a different use of the space
Load factor kWh ÷ (peak kW × hours) Peaky operations; demand-charge opportunity
Capacity tag per 1,000 ft² Tag kW ÷ ft² × 1,000 Summer-peak exposure; each kW ≈ $120/yr at 2026/27 prices
Month-over-month change This month vs same month last year, weather-adjusted Something broke, schedules drifted, or billing error

Build the table once, update monthly

  1. Inventory: every account, meter, service address, utility, rate schedule, legal entity, supplier and contract end date.
  2. Data feed: monthly bill data (kWh, kW, $ by component); interval data for larger sites.
  3. Normalize: square footage, operating hours, production, and heating/cooling degree days.
  4. Flag: anything more than 15–20% off its peer group or its own history.
  5. Act: each flag gets an owner — operations, facilities or procurement.

What analytics usually uncovers in Ohio portfolios

  • Sites still on the utility default price or a rolled-over variable rate after a contract ended.
  • Small accounts auto-enrolled in community aggregation that should be on the portfolio contract (or vice versa).
  • Meters on municipal systems or co-ops mistakenly included in supplier bids.
  • A single building setting most of the portfolio's capacity-tag growth.
  • Wrong rate schedules after equipment or usage changed.

FAQ

What is a good all-in electricity cost per kWh for an Ohio business?

It depends on size and load shape. For context, EIA reported Ohio's average commercial price at about 13.8¢/kWh for January–June 2026, up from about 11.1¢ a year earlier.

How many sites justify energy analytics software?

A spreadsheet works for a few dozen accounts; beyond that, utility bill-management or analytics software saves time.

Which metric finds savings fastest?

All-in ¢/kWh by site — it immediately exposes sites on the wrong contract or with demand problems.